

- #Does windows 10 support olympus master upgrade
- #Does windows 10 support olympus master software
- #Does windows 10 support olympus master series
This happened to me a number of times in the past, and the problem was easy to reproduce. I could, however, see one significant change not documented by Olympus: the sleep mode power problem seems to be fixed! Originally, forgetting to turn the camera off and letting it enter the sleep mode (followed by the four-hour turn-off) would result in the battery almost completely depleted. The procedure went smoothly, and I wasn't able to see any changes in captured images or in camera's behavior (except for those listed above). I suspect some quiet tweaks and/or fixes have also been introduced this was the reason I decided to upgrade.
#Does windows 10 support olympus master upgrade
These changes are of tertiary, not even secondary, importance I doubt Olympus would release an upgrade just to introduce them. Fine, although I keep my time-out at three seconds anyway.Īn additional confirmation is required when raw and JPEG files (if saved from the same picture) are about to be erased. The control dial time-out, adjustable from the Settings menu, can be also set to a new value: 8 seconds (in addition to 3 and 5 available in the original version). Frankly speaking, I would prefer to see an option to re-assign it to some other function. The Reference WB button, in addition to being re-assigned to other functions, can now be totally disabled. This version, installable (as usual) via the Olympus Master application, introduces some small improvements according to Olympus, these are: Two months after the camera release, Olympus offered an upgrade to the firmware, Version 1.1. At this moment I may say that both available updates are of rather minor importance, though. NOTE: Upgrading the firmware will revert all your camera settings to factory defaults! If you've invested in customizing your camera, you will have to do it again after the upgrade.Īlthough the original firmware in the E-500 seemed to have no visible problems, Olympus keeps updating it on a quite regular basis. Olympus was one of the last big makers to allow for that back in '2001 I had to send my E-10 to their repair center to have the firmware upgraded.Ī new version may, in addition to fixing bugs, optimize and speed up some functions, adjust parameters (and therefore change behavior) of some others, or even add some entirely new functionality or options. In recent years these new versions are often user-installable. This is why many manufacturers release updates or upgrades (depending on the scope of changes) to their cameras' firmware. The firmware in digital cameras is at least two orders of magnitude more complex than the firmware in film cameras (assuming the latter use it).

#Does windows 10 support olympus master software
The more complicated the software is, the more of those will show up. If your firmware gets lost or corrupted, your camera is dead, and requires the firmware to be reinstalled by the manufacturer.Īny non-trivial software has bugs and glitches, not to mention room for improvement.

Some cameras may use EPROM (erasable, programmable read-only memory), but these need special reprogramming devices if the firmware is to be replaced with a newer version, so this alternative is less practical.Īnyway, you may think of your camera as a dedicated computer, capable of running just one program, with firmware being that program. The second is usually implemented by storing the firmware in flash memory, the state of which is not lost when the power supply is interrupted (batteries taken off the camera). The first point is obvious: you will not use your camera for word-processing (although I wouldn't be surprised to see that one day). It is persistent, i.e., not erased by powering the device off or even removing the batteries.
#Does windows 10 support olympus master series
